Last edited by Taudal
Sunday, July 19, 2020 | History

2 edition of Desert Sunlight Solar Farm Project, California Desert Conservation Area plan amendment and final environmental impact statement found in the catalog.

Desert Sunlight Solar Farm Project, California Desert Conservation Area plan amendment and final environmental impact statement

for the Palm Springs - South Coast Field Office

by United States. Bureau of Land Management. Palm Springs Field Office

  • 21 Want to read
  • 16 Currently reading

Published by U.S. Department of the Interior, Bureau of Land Management, Palm Springs Field Office in Palm Springs, California .
Written in English

    Subjects:
  • Public lands,
  • Ecology,
  • Electric power transmission,
  • Environmental aspects,
  • Environmental conditions,
  • Management,
  • Overhead electric lines,
  • Solar power plants

  • About the Edition

    This Plan Amendment/Final Environmental Impact Statement (PA/FEIS) addresses the possible United States Bureau of Land Management (BLM) approval of an amendment to the California Desert Conservation Area Plan (CDCA Plan) to allow for solar energy and of a right-of-way (ROW) grant to lease land managed by the BLM for construction, operation and decommissioning of a solar photovoltaic energy generation facility. The Agency Preferred Alternative covers approximately 4,176 acres (ac), managed by the BLM, and would generate 550 megawatts (MW) of electricity annually. The PA/FEIS identifies impacts of the Agency Preferred Alternative, including impacts related to biological resources, cultural resources, land use, visual resources, hydrology, water quality, and water use.

    Edition Notes

    Other titlesFinal environmental impact statement and California Desert Conservation Area Plan amendment
    The Physical Object
    Pagination5 volumes (various pagings) :
    ID Numbers
    Open LibraryOL25904812M
    OCLC/WorldCa901555809


Share this book
You might also like
The memorial volume, a history of the Third Plenary Council of Baltimore, November 9-December 7, 1884

The memorial volume, a history of the Third Plenary Council of Baltimore, November 9-December 7, 1884

Clean Air Standards Attainment Act of 1987

Clean Air Standards Attainment Act of 1987

Of men and planes.

Of men and planes.

In search of Byzantium

In search of Byzantium

East of the sunrise

East of the sunrise

Real-time monitoring of field measurements for mine design

Real-time monitoring of field measurements for mine design

Embrace the Wind

Embrace the Wind

The Only Game

The Only Game

magic suit

magic suit

neuroanatomy of an amphibian embryo spiral cord

neuroanatomy of an amphibian embryo spiral cord

Principles of empirical realism

Principles of empirical realism

Controlling technology

Controlling technology

Proceedings of Crockers Iowa Brigade ... biennial reunion ...

Proceedings of Crockers Iowa Brigade ... biennial reunion ...

Desert Sunlight Solar Farm Project, California Desert Conservation Area plan amendment and final environmental impact statement by United States. Bureau of Land Management. Palm Springs Field Office Download PDF EPUB FB2